EXPECTATIONS:
As we work to finish our building, there are a lot of items that would be very expensive to hire. However, they are projects that do not require professional skill levels. If you are interested in these projects we will work to pair you up with others with similar availability and expertise. The church will supply all of the materials needed including tools.
SCHEDULE:
Scheduling for these projects is very flexible. We will work with your schedule to give you access to the building or help pair you with others who have the same availability. We are hoping to have these projects finished by June 1 unless otherwise noted.
DETAILS:
Below is a comprehensive list of the projects and the level of experience needed. On the interest form you will not be committing to a project, but letting us know you are interested in helping get this building to the next level so God can use us to reach people for His glory.
PROJECT |
Skills Needed |
Target |
LANDSCAPING – Remove Trees/Stumps |
Intermediate Chain Saw |
Apr 1 |
INSTALL – Garbage Disposal in 3-Sink |
Basic plumbing |
May 1 |
INSTALL – Garbage Disposal in Island |
Basic plumbing |
May 1 |
BUILD – Security Office Floor |
Advanced Carpentry |
May 1 |
INSTALL – Cabinets – Kids Classroom |
Intermediate Carpentry |
May 1 |
INSTALL – Cabinets in Kids’ Alley |
Intermediate Carpentry |
May 1 |
INSTALL – Door Stops |
Basic Carpentry |
May 1 |
INSTALL – Insulation above offices |
Basic Carpentry |
May 1 |
INSTALL – Lights in balcony stairs |
Intermediate Electrical |
May 1 |
INSTALL – Lobby handrails |
Intermediate Paint |
May 1 |
INSTALL – Shelf in Lobby |
Intermediate Carpentry |
May 1 |
INSTALL – Wrap sprinkler pipes 1&6 |
Basic Carpentry |
May 1 |
PAINT – Lobby handrails |
Intermediate Paint |
May 1 |
PAINT – Parking lot stripes black |
Basic Painting |
May 1 |
PAINT – Youth bathrooms |
Intermediate Painting |
May 1 |
REPAIR – Balcony wall |
Intermediate Drywall |
May 1 |
WIRING – Crimp Ends for Data Cables |
Intermediate Electrical |
May 1 |
WIRING – Trace Data Wires |
Intermediate Electrical |
May 1 |
WIRING – Data Wall Plates Installed |
Intermediate Electrical |
May 1 |
CLEAN – Custodial closets |
Basic Cleaning |
June 1 |
CLEAN – Facilities room |
Basic Cleaning |
June 1 |
CLEAN – Fire Extinguishers |
Basic Cleaning |
June 1 |
CLEAN – Kitchen |
Basic Cleaning |
June 1 |
CLEAN – Lobby speakers /wall slats |
Basic Cleaning |
June 1 |
CLEAN – Lobby top windows |
Basic Cleaning |
June 1 |
CLEAN – Classrooms |
Basic Cleaning |
June 1 |
CLEAN – Offices |
Basic Cleaning |
June 1 |
CLEAN – Restrooms |
Basic Cleaning |
June 1 |
CLEAN – Doors/Floorboards |
Basic Cleaning |
June 1 |
CLEAN – Laundry Room |
Basic Cleaning |
June 1 |
INSTALL – Acoustic Panels – Green Room |
Intermediate Carpentry |
June 1 |
INSTALL – Acoustic Panels – Serve Team |
Intermediate Carpentry |
June 1 |
INSTALL – Shelf in Serve Team Room |
Intermediate Carpentry |
June 1 |
INSTALL – Televisions |
Intermediate Carpentry |
June 1 |
PAINT – IT Closet |
Intermediate Painting |
June 1 |
LANDSCAPING – Weed West Side |
Light Labor |
June 1 |
LANDSCAPING – Weed East Side |
Light Labor |
June 1 |
LANDSCAPING – Mulch |
Light Labor |
June 1 |
LANDSCAPING – Refresh Monument |
Light Labor |
June 1 |
INSTALL – White Boards |
Intermediate Carpentry |
June 1 |
INSTALL – Acoustic Panels Cmmty Room |
Intermediate Carpentry |
June 1 |
BUILD – Sanctuary Camera Platform |
Advanced Carpentry |
Aug 1 |
PAINT – Kitchen |
Intermediate Painting |
Aug 1 |